Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit

Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit

one. CZPTstars air dealing with unit and air handler features
1) AHU situation is the large-energy aluminum alloy frame, with built-in insulation resources, no cold bridges.
two) The aluminum material surface treated by anodizing seems good and corrosion-resistant. The panel is 25mm thick and of double pores and skin composition.
   Both the interior and outer panel plates are made of good quality Korean galvanized steel painted, beautiful and trendy design and style
three) The sandwiched PU foam insulation content between the plates guarantee the greatest efficiency of insulation, depth, rigidity, cleanliness and sound insulation for the AHU,
   and ensure no condensed drinking water on the area
4) In the hole in between the body and the panel humidity-evidence materials has been utilized to seal up, avoid air leakage and power decline
five) The foundation body is scorching-dip galvanized metal, Anti-corrosive

two.CZPTstars Air handler,air handling device, ahu application
one) Heating
2) Cooling
three) Ventilating
four) Air-conditioning (HVAC)technique
this sort of as buying shopping mall, business heart ,Hospital and operation area ,cleanse place , dust-free of charge plant

3.Air handler technological info, Assembly drawing diagram and image

Ceiling Ducted Air Dealing with Device(Return Air Condition-four Rows)
Design Air Flow   Total
Force
Energy Input Return Air
Cooling Capability Heating Capability Water Flow  Water Resistance Drinking water inlet/outlet pipe Diameter
*1000CMH Pa kW kW L/min kPa DN
EST2CD4 2 250 .twenty five twelve.7 seventeen.six 36 8.eight 25
EST2.5CD4 2.five 250 .32 15.5 21.six forty four.four twelve.seven twenty five
EST3CD4 3 three hundred .55 18.7 26.one fifty three.four 19.6 32
EST4CD4 4 three hundred .75 26 36.2 seventy four.4 21.six 32
EST5CD4 5 350 one.1 32.3 44.8 92.4 17.six 40
EST6CD4 six 350 1.5 37.three fifty two.one 106.8 twenty.6 40
EST7CD4 7 350 1.five forty three.9 sixty one.three 126 28.4 fifty
EST8CD4 eight 350 two.two 50.six 70.five one hundred forty five.two 29.4 50
EST10CD4 10 350 two.2 sixty.4 eighty four 172.eight 21.6 fifty
EST12CD4 twelve 350 3 73 101.7 209.four 22.5 50
Ceiling Ducted Air Handling Unit(Return Air Problem-6 Rows)
Design Air Flow   Total
Stress
Electrical power Enter Return Air
Cooling Potential Heating Potential H2o Circulation  Water Resistance Drinking water inlet/outlet pipe Diameter
*1000CMH Pa kW kW L/min kPa DN
EST2CD6 2 250 .25 sixteen.9 21.8 forty eight ten.8 twenty five
EST2.5CD6 two.5 250 .32 20.7 26.7 fifty eight.eight sixteen.7 twenty five
EST3CD6 three three hundred .fifty five 24.3 31.five sixty nine.six 18.6 32
EST4CD6 four three hundred .seventy five 31.6 40.9 ninety.6 twenty.6 40
EST5CD6 5 350 1.one 39.three 50.7 112.2 30.four 40
EST6CD6 six 350 one.five forty five.6 fifty nine.1 130.8 seventeen.six 50
EST7CD6 seven 350 1.five fifty four 69.9 154.8 21.6 fifty
EST8CD6 8 350 2.two 62.eight 81.3 180 22.5 50
EST10CD6 ten 350 2.two 78.seven 101.eight 225.6 thirty.4 fifty
EST12CD6 twelve 350 three 94.4 122.1 270.six 33.3 sixty five
Be aware:
  one. Return air: Cooling: Air in 27ºC DB, 19.5ºC WB,Chilled drinking water in/out:7ºC /12ºC
  two. Return air: Heaing: Air in 15ºC DB,Very hot h2o in: 60ºC.

four. CZPTstars air handling unit , air handler assortment or collection
-Ceiling ducted(jet flow) air dealing with device
-Vertical flooring (totally free blow)standing air managing device
-Horizontal ground standing air managing unit
-Modular Modulus Air Managing Unit-multi-operate air dealing with unit

5. Factors-air dealing with unit or air handler
Casing Panel and Insulation
• CZPT pores and skin design is offered by sandwich type panels comprising inner and outer painted metal skins and polyurethane foam with least 48kg/m3 density,
   delivering a good thermal and acoustical overall performance
• The gasket liner between the panels and body guarantees the air leakage fee to comply with GB/T 14294 cleanse air conditioning requirement
• The manufacturing facility painted steel sheet lined with 6 insulation coatings, complies to 500h salt spray testing, showing an outstanding corrosion security overall performance

Frame
•Penta-put up added hefty gauge aluminum profiles and strong fiber-bolstered PE corner link forming the structural  frame
• outstanding mechanical strength and rigidity to the unit body and to prevent any buckling or deformation
• Thermal bridge free design and style, the profiles loaded with polyurethane foam for insulation
• Anodizing surface area treatment for profiles, corrosion-resistant
• Stainless steel frame CZPT

Hot-Dip Galvanized Base channel
Offer Rigid Foundation Channel safeguard unit and help save set up expense

Popular Manufacturer Blower and Motor
•Energy saving Supporter with low speed and minimal sound
•Type: Immediate driven / Belt driven
            Ahead curve and backward curve
            Centrifugal admirer and EC plug admirer
•Brand: Nicotra, Kruger, Deton, Yilida CZPT
•Low sound lengthy life Motor
•Brand: Siemens, ABB and Teco CZPT

Vibration Eliminator
• To reduce the transmission of vibration and sound, fan and motor are mounted on an unbiased complete base body
• The complete foundation body is isolated by deflection sort spring isolators
• This unique framework not only reduce the vibration and sounds, but also safeguard enthusiast and motor for the duration of transportation

High Effectiveness Cooling and Heating Coil
• All coils calculation and selection is accomplished by choice software program to match the required circumstances
• Massive coil confront region assures greatest warmth transfer price
• All coils tested at 30bar strain underwater 24 several hours
• Different corrosion resistance coils for option:
-Cooper tube with cooper fins coil
 -Epoxy coated fins coil
 -Electrophoresis fins coil
-Heresite coated coil

Substantial Effectiveness Filter
Air filter consist of main air filter, medium efficiency air filter, large result and sub-high performance particulate air filter.
a) Main filter have board sort and pocket kind, board sort air filter use fiber components, pocket variety primary air filter use Non-woven or specific chemical fiber,
     have the edge of washable, minimal resistance, stable functionality etc, filter grade G1~G4.
b) Medium efficiency air filter have board type and pocket type, use ultra-thin chemical fiber or fiber glass, have the benefit of extended provider-life, secure overall performance,
    filter quality F5~F9
c) Substantial effectiveness and Sub-substantial effectiveness particulate air filter use extremely-slender chemical fiber or fiber glass, have dense folded kind and pocket variety for pick,
    filter quality can attain up to H13.

Stainless Metal Drain Pan
• Slop type design, no drain h2o carryover and hold the pan dry
• Stay away from the micro-organisms expansion inside the drain pan
    Antimicrobial Drain Pan is offered as alternative
• SteriTouch technological innovation Drip Pan Coating
• Antimicrobial floor
• Very good exterior toughness and corrosion resistance
• Excellent adhesion
• Non-toxic, comply with BS476 portion seven

Air damper
•Variable discharge air quantity
•Discharge damper with axial admirer, independent control
•High effectiveness
•Manual damper CZPT

Humidifier optional
The humidifier frequently be utilised have: electrode humidifier, dry steam humidifier, higher force spray humidifier and moist film humidifier and so forth
a)Electrode humidifier
Isothermality humidification sort, use AC electrical energy can direct heating h2o supply to make clear vapour and combine vapour with the air, insert-moist into the air. the advantage is humidifying fast, humidifying volume can adjustable, humidifying vapour is thoroughly clean, no incrustation scale,no dust, sterile and odourless, hassle-free to servicing.

b) Dry vapour humidifier
Isothermality humidification sort, substantial humidification effectiveness, corrosion resistance, in location have vapour supply,dry vapour humidification will have a larger humidification handle precision

c) Large force spray humidifier
Isenthalpic humidification method,use stainless drinking water distributor and sprayer,substantial force spray,large strength efficiency,secure and dependable.substantial force spray humidifier humidification efficiency forty%~50%.

d) Moist movie humidifier
Soaked film humidifier have advantage of high saturation efficiency,save drinking water,help save energy etc

PTC CZPT Heating optonal
•Constant temperature heating
•Virtually unrestricted life
•Low electrical energy consumption and extremely lower in cost
•No electrical noise
•The larger the temperature, the much more electric power effective
•Avoid burning when in make contact with with combustible resources

Warmth Wheel Warmth Exchanger(optional)
• Extremely productive vitality-saving rotary warmth exchanger
• Vitality restoration charges amongst 70-90%
• Summer season software is dehumidification of warm and humid offer air to reduce the strength use of the down stream cooling tools. 
• Wintertime operation recovers dampness from the exhaust air to minimize the humidification load.

Electrostatic Precipitator(optional)
• Adsorb and take away particles much less than .01 micron in the air
• Enhance indoor air quality 
• ESP applies power only to the particulate issue being gathered and consequently is extremely productive in its usage of vitality

CZPTal handle cupboard(optioanl)
•According to the demands and features of the unit to design and style the management console or cupboard
•Auto control each section of the device to make sure the temperature, humidity and cleaness 
•High good quality and intercontinental model electrical elements
•DDC and PLC CZPT

6.Why choose us?
CZPTS Advantages: 
1) The Proof of Quality: Now we have customers in different countries and places, such as Mexico, Australia, New Zealand, Singapore, Argentina, Middle- East, Africa…
two) The Guarantee of Quality: Reasonable design, Professional technicians, Stable production workers, Full-scale
 Equipments, Strict QA & QC system…
3) CZPT-made Design: We supply our design drawing according to customer practical situation
four) Technique Support: 
 Walk in cold room: we supply our diagrammatic drawing, feel easier for installation.
 Cold storage warehouse: We have professional engineers who can go aboard to supply technology support and direction, until  turn key for our customers. 
5)CZPT Trade Operation: We have concentrated on international trade of cold storage room line for many years, accumulated various experience from different customers of different countries. So we can update our operation in time according to our customers and new rules. It is helpful to clear custom and save cost and time for our customers.

7.FAQ
one:Are you a factory?
— Yes, we are a specialist company for far more than thirteen many years

2:How do you verify the items?
— We inspect all the components when they arrive, and have location inspection during creation process. All products will be tested and double inspected prior to delivery, supplying one hundred% guarantee for clientele.

3:How to pick the ideal designs?
—The parameters previously mentioned is just for your reference. We require you to provide us the air flow, ESP or TSP, cooling potential, heating ability or software for our team to style the suited unit for you.

four:How and when can I get the quotation?
— Send out us the inquiry or go away us message. We will get back again to you within one hour during the doing work time. All messages will be replied anytime they arrives.

five:What’s your payment terms?
— Typically we accept T/T or LC. 30% deposit. Other payment terms can be mentioned when orders verified.

six:Where is your factory Found? How can I check out there?
— We located in HangCZPT, ZheJiang Province, which is in close proximity to HangCZPT CZPT Airport. We can pick you up from the airport . You are warmly welcome to pay a visit to us

7:Do you offer OEM services?
— Sure! We give OEM and ODM services.

8:What is actually the lead time for your products?
— Usually 25~thirty workdays. For urgent orders, we can make particular arrangement to fulfill your request. 

eight.CZPTer go to us

9.Air handling unit,air handler shipping and delivery or container loading

10.Installation instruction or installation photograph, task pictures
—1. During installation, enough space should be reserved about the device, specially aside the obtain doorway and h2o pipe, for the fix equipment passing. 
—two. The device should be mounted on flat foundation (concrete or welded C-channel).  Drainages are CZPT about the base.
—three. Floor drain need to be established in the device place for the discharge of condensing h2o and washing h2o.
—four.Shell out attention to condensing h2o discharging to make sure the condensing drinking water discharge efficiently.
—5. The device ought to be installed on a horizontal platform or hanger.  Following the unit is mounted, connect the kinds of pipes and ducts:
A. The chilled h2o pipe relationship with cooling coil
B. The condensing water drain pipe connection
C. Humidifier pipes relationship
D. The connection for the new/return air inlet with its air ducts
E. The wiring connection for the manage box.
When connecting the air duct, a hundred-150mm adaptable link (airtight canvas or artificial leather cloth) need to be established among flange and air inlet/outlet, to avoid the air leakage triggered by the unit vibration.

The control box typically is mounted on the device cabinet or in the machine space. Make sure you make the wiring according to the associated electrical regulation by your nation.

—6.After all water pipe, wirings and air duct are accurately related, the air dealing with unit can be started out.
[ !]The initial time beginning ought to be instructed by an experienced particular person at web site, non-knowledgeable particular person can’t work the tools CZPT permit.  The defect caused by misuse shall not be our obligation
[ !] Ahead of initial time commencing, remember to get rid of the short term correcting plate from the fan and motor
[ !] The energy and voltage source have to be compatible with the unit.  Soon after connecting the electrical power to the motor, commence motor initial, then check out the operating route of the enthusiast. If it is operating in opposite path, remember to stop and change the phase sequence, then join the electrical power to motor lastly. If there is safety device on the provide fan motor, the motor raring should be linked to floor.  The motor in this device use “diminished voltage starting”.
—7. Adjustment of the driving belt
—8. Prior to shifting the unit, you should fasten the damping unit.  Placing down need to be little by little to make positive that the damping system is forced evenly to defend the damping unit.  The relationship among damping device and the unit must not be by welding

 

Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit