Parallel Shaft 220V 380V 50Hz Geared Motor

Parallel Shaft 220V 380V 50Hz Geared Motor

F series Parallel Shaft-CZPTcal Geared Motor Attributes

1.Features:

  1. High effectiveness: ninety two%-94%
  2. Parallel output, compact composition, large output torque, smooth operation, minimal noise and extended support life.
  3. Large precision: the equipment is created of high-top quality alloy steel forging, carbonitriding and hardening treatment, grinding procedure to ensure substantial precision and secure working.
  4. High interchangeability: highly modular, serial design and style, sturdy flexibility and interchangeability.

2. CZPT parameters

Ratio three.seventy seven-276.77
Enter electricity .12-200KW
Output torque three.5-21700N.m
Output pace five-352rpm
Mounting type Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Method Flange enter(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor
Brake Launch HF-guide launch(lock in the brake launch situation), HR-manual release(autom-atic braking situation)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Kind F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 higher-energy cast iron from R37,47,57,sixty seven,77,87
Housing substance HT250 Large energy cast iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment
Efficiency ninety two%-94%
Lubricant VG220
Safety Course IP55, F class

CZPTshine Drive

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the total energy transmission resolution for high-conclude gear production industries dependent on the goal of “System Product, Application Layout and Skilled Service”.
CZPTshine have a robust complex drive with more than 350 personnel at current, such as in excess of 30 engineering technicians, thirty quality inspectors, covering an region of 80000 square meters and kinds of innovative processing machines and testing equipments. We have a excellent foundation for the business application advancement and service of high-end velocity reducers & variators possessing to the provincial engineering engineering research center,the lab of equipment velocity reducers, and the base of modern day R&D.

Our Crew

Quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.
All our products get ISO & CE & UL certification.

Packing

Supply

Parallel Shaft 220V 380V 50Hz Geared Motor